Sign In | Join Free | My chinacomputerparts.com
China Jiangxi Zhongtian Intelligent Equipment Co., Ltd. logo
Jiangxi Zhongtian Intelligent Equipment Co., Ltd.
Intelligent Hoist Leads the Future!
Active Member

2 Years

Home > Tower Crane Fixing Angle >

154HC Tower Crane Fixing Angle

Jiangxi Zhongtian Intelligent Equipment Co., Ltd.
Contact Now

154HC Tower Crane Fixing Angle

Place of Origin : CHINA

Certification : CE、ISO

Delivery Time : 10-60 Days

Brand Name : ZTM

Price : Cost-effective

Packaging Details : Well Packed

Contact Now

Tower crane 154HC Fixing Angle

Tower crane fixing angle is connected between Tower body and concrete foundation. We could provide Liebherr tower crane fixing angle 120HC/132HC/154HC/290HC

Model: Liebherr 154HC Fixing Angle

Size: 0.3*0.3*1.34m

Connected by: Bolt

Bolt Size: M36*400mm

Type: Split structure

Material: Q345B

Weight: 580kg

Apply for: Liebherr Tower Crane

Matching mast section size:1.8*1.8*2.5M

Photo of liebherr fixing angle 154HC

154HC Tower Crane Fixing Angle

Tower crane foundation leg details

154HC Tower Crane Fixing Angle

Tower crane foundation fixing angle features

a. The original steel material comes from China famous steel factory.

b. From cutting, welding, painting, drying till final packing, the standard inspection procedure is set up.

c. Tooling is adopted for the Steel Structure manufacturing, which makes sure that every product is total same with each other.

d. Final penetration detection of ZTM tower crane steel structure is one of the guaranteed of the reliable quality.

ZTM tower crane fixing angle

Our factory produce and supply almost all famous brand tower crane spare parts : Mast section, Anchor Frame, Fixing angle ,Adaptor and so on . Provide High quality tower crane Accessories as well as other spare parts of tower crane with good quality, competitive price, short delivery and professional service.

154HC Tower Crane Fixing Angle

Application of tower crane fixed leg

Tower crane foundation was poured in two stages. A mud slab approximately 1’-0” thick was placed first to provide a stable surface for the tower crane base section to set on. Once the mud slab was cured the tower crane foundation was formed and reinforced, tower crane base section was set, and then foundation was poured;

154HC Tower Crane Fixing Angle

ZTM Company and workshop

154HC Tower Crane Fixing Angle

Loading and shipping

154HC Tower Crane Fixing Angle


Product Tags:

154HC Tower Crane Fixing Angle

      

ZTM Tower Crane Fixing Angle

      

CE fixing angle tower crane

      
China 154HC Tower Crane Fixing Angle factory

154HC Tower Crane Fixing Angle Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangxi Zhongtian Intelligent Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)