Sign In | Join Free | My chinacomputerparts.com |
|
Place of Origin : CHINA
Certification : CE、ISO
Delivery Time : 10-60 Days
Brand Name : ZTM
Price : Cost-effective
Packaging Details : Well Packed
Model Number : 5527
Max capacity : 14t
Max tip capacity : 2.7t
Max free-standing height : 47.2m
Max boom jib length (radius) : 55m
ZTL326 14ton luffing jib crane basic introduction
Model | ZTL326(5527) |
Jib Length (M) | 55 |
Height (M) | 47.2 |
Tip Load (T) | 2.7 |
Mast Section Dimension (m) | 2.0×2.0×3.0(Round tube steel) |
Voltage | 380V/50HZ |
Hoisting mechanism | 100LVF80L (75KW) |
Hoisting Speed (a=2)m/min | 0-107.9 Frequency Conversion |
Hoisting Speed (a=4)m/min | 0-53.9 Frequency Conversion |
Slewing Speed (r/min) | 0-0.6 Frequency Conversion |
Luffing Speed (m/min) | 15-85° 2.2 |
Luffing Motor power(KW) | 55 |
Base Form | Embed legs -Built-in Type |
Container | 7 No. of 40’HQ +1*40FR |
The tower crane is equipped with all kinds of reliable safety devices, such as hoisting height limiter, slewing range limiter and multifunctional limiter to control the load moment, hoisting capacity and trolley traveling range. Its PLC (Programmable Logic Controller) unit can diagnose the cause of breakdowns.
ZTL326 luffing crane performance reference
Load chart and luffing jib
Various parts of the luffing tower crane
Mast section
The section section of the ZTM tower crane is equipped with an inclined climbing ladder and a hot-dip galvanized resting platform every 3 meters to ensure the safety of construction personnel.The mast section use high-quality steel tube with curve in each side, which has very good wind resistance effect. All the steel structure are processed by the short blasting & rust getting-rid-of treatment.
Cabin and electric control cabinet
Integrated cab, high-definition display, large internal space. Built-in air conditioner and electric control cabinet, electrical components adopt ABB and Schneider brand, stable operation, not easy to wear.
Welding and quality control
Automatic robot welding, multi-layer and multi-pass welding are used to prevent weld cracking and improve the reliability and service life of the crane.After the steel is welded, we will also conduct magnetic particle inspection to ensure that there are no cracks
Our company
More choices for you
Overseas project
Packaging and shipping
![]() |
ZTL326 Luffing Tower Crane 14t Capacity 55m Jib Length 2.7t Tip Load Hoisting Equipment Images |